Oh, well - the supplier of the aluminium butt-weld flange has problems with the delivery. I will not wait for X weeks.
So I'll go back to the full-plywood system and make a collar from 1-2 layers of 30mm ply with 6-8 bolts though the whole partners package.
The bottom part of the mast (130x5) should arrive mon-wed along with the battens.
The bottom paint job is done, and with a decision of leaving everything not essential to basic sailing for next year, this could theoretically mean a splash day in a week. More realistically in two.