Thanks David!
All makes sense to me.
So my plan as of now is to install the main bulkhead, which already has a beam on ether side of it. This beam runs across the entirety of the caben, from port to starboard. (Originally was the main suport for the Bermuda rig). forward of that, I will glass in the forward bulk head.
This head will take the shape that David has recommend. The only difference is that it will be taken down to the floor of the caben floor. It was originally 1/2 in ply but I will laminate that with 3/4 ply on ether side. The 3/4 ply will come to the Midway point of the hull. (As pictured in the example).
In between the two bulk heads is where the head and a hanging closet are. These will be reinstated with 1/2 in ply forming the "doorways". The doreways are about a foot and a half from the center of the mast partners. The combination of the two bulkheads (forward and aft), and the doorways (port and starboard), form a rectangle on the caben ceiling. This rectangle will be reinforced with three pieces of laminated 1/4 in ply.
Above deck, three more pieces of 1/4 in ply will be mounted.this will be the same shape as the rectangle on the ceiling of the caben. The post to receive mast shims will be above that, "Four pieces of 3/4 in ply rings". These will be bolted through; the three pieces of 1/4 in ply above deck, the deck itself, the three pieces of 1/4 in ply below deck.
It should all be less work than it is writing it down. I just wanted to say it out loud on the internet so I can start the process with some peace of mind.
Thanks to anyone who understands. Hahahaha
Hotdog